Description: * Low Energy Consumption And Low Heat. * Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. * Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F * Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F * Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. * Get other LED models? Please search "Diodes". Product Overview: 100 pcs LED Diodes + 100 pcs Resistors Product Features: Blue Lights / 5mm Flat Clear Lens Lens Product Parameters: 29mm Long Lead / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs Product Parameters: Luminance Brighter Up To +20% / Wavelength 460nm-470nm / 60° Viewing Angle / Single LED Diodes Wight: 0.24g Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / ±1% Tolerance
Price: 10.51 USD
Location: Swansea, Massachusetts
End Time: 2024-11-13T11:15:55.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
Return shipping will be paid by: Seller
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Return policy details:
LED Color: [08] Blue / 100pcs
Size: 5mm Flat Top
EAN: 0611355169221
ISBN: 0611355169221
Package Dimensions LxWxH: 5.91x4.06x0.67 Inches
Weight: 0.1 Pounds
Type: Does not apply
Brand: EDGELEC